    Commercial EV Charging Station Installation

    Set up a revenue-generating EV charging hub across South India. DC fast chargers, DISCOM compliance, CMS software — turnkey from ₹15 lakhs. 18–30 month ROI.

    30 kW to 240 kW DC fast chargers
    18–30 month payback period
    70–85% revenue share for franchise partners
    Full DISCOM compliance & PM E-DRIVE subsidy support

    Investment & ROI Breakdown

    Real numbers from operating PixellEnergy hubs across India.

    Essential Hub

    2 AC (7.4 kW) + 1 DC (30 kW)

    Investment₹15 – 20 Lakhs
    Monthly Revenue₹80K – 1.2L
    Payback24–30 months
    Best Value

    Premium Hub

    2 AC (22 kW) + 2 DC (60 kW)

    Investment₹25 – 35 Lakhs
    Monthly Revenue₹1.5L – 2.5L
    Payback18–24 months

    Hypercharge Hub

    4+ DC Fast (60–240 kW)

    Investment₹50 – 80 Lakhs
    Monthly Revenue₹3L – 5L+
    Payback20–28 months

    Installation Timeline

    From application to go-live in 6–8 weeks. We manage the entire process.

    1
    Week 1

    Site Assessment & Load Calculation

    Our engineers assess your location's electrical capacity, transformer proximity, and optimal charger placement.

    2
    Week 2–3

    DISCOM Application & Documentation

    We prepare and submit your application to the relevant utility — KSEB (Kerala), BESCOM/MESCOM/CESC (Karnataka), TNPDCL (Tamil Nadu) or TGSPDCL (Telangana) — with load calculations, site plans and safety compliance documents.

    3
    Week 3–5

    Electrical Infrastructure

    Dedicated cabling, earthing, distribution boards, and transformer upgrades (if needed) are installed.

    4
    Week 5–6

    Charger Installation & CMS Setup

    Chargers are mounted, connected, and integrated with Pixell CMS for remote monitoring, payments, and analytics.

    5
    Week 6–8

    Inspection & Go-Live

    The state electrical inspectorate and your DISCOM inspect and energise the connection. Your station goes live on the PixellEnergy network — visible to all EV drivers.

    Ready to Build Your Charging Hub?

    Get a free commercial site assessment. We'll analyse your location's potential, estimate ROI, and handle everything from DISCOM approvals to go-live.

    Free PDF Guide

    2026 South India EV Charging Subsidy Guide

    KSEB, BESCOM, TNPDCL & TGSPDCL approvals, subsidies & installation costs — free download.

    We'll send the PDF straight to your WhatsApp.

    No spam. Your data stays private.

    FAQs

    Commercial EV Charging FAQs

    A basic commercial EV charging hub with 2 AC and 1 DC charger costs ₹15–20 lakhs including equipment, installation, and DISCOM compliance. Premium hubs with multiple DC fast chargers range from ₹25–80 lakhs. Government subsidies under PM E-DRIVE can offset 30–40% of equipment costs.
    Based on data from operating PixellEnergy hubs, ROI ranges from 18–30 months depending on location, charger mix, and utilization rates. Contact us for a personalized P&L projection based on your specific location.
    Yes. Every commercial EV charging installation needs approval from the local distribution utility — KSEB in Kerala, BESCOM/MESCOM/CESC in Karnataka, TNPDCL in Tamil Nadu and TGSPDCL in Telangana — covering load sanctioning, safety inspection and energisation. PixellEnergy handles the entire approval process as part of our turnkey model.
    Public-charging tariffs vary by state and are set by the state regulator (KSERC, KERC, TNERC, TGERC). Typical commercial/EV-category rates land between ₹6.50 and ₹9.50 per kWh, and most states apply time-of-day pricing where solar-hour consumption is cheaper. We share the exact applicable slab for your site during the assessment.
    High-traffic locations yield the best returns: national-highway junctions (NH 44, NH 48, NH 66, NH 544), IT corridors (Whitefield, OMR, HITEC City, Kakkanad), shopping malls, hospital complexes, fuel stations and tourist hotspots. We provide detailed location analysis during site assessment.
    From application to go-live, a standard commercial installation takes 6–8 weeks. This includes DISCOM approval (2–3 weeks), electrical infrastructure (2 weeks), and charger installation and commissioning (1–2 weeks). PixellEnergy manages the entire timeline.